Login Design My Cluster

Cloud migration, any direction.Planned cutover with a way back.

Our cloud migration service moves workloads into a public cloud, out of one, or between providers. We map dependencies first, plan the cutover and keep a rollback path until you are ready to let go.

Cloud migration without guesswork.Know what moves together before anything moves.

Most cloud migration problems come from what nobody wrote down: a service that calls a database in another environment, a scheduled job that expects a file share, an application that needs a license server. We start by mapping those dependencies so workloads move in groups that work.

Then we plan the cutover window with your team, test it, and keep the source environment ready so you can roll back if something does not behave.

  • Into a public cloud from your cluster
  • Out of a public cloud onto single-tenant hardware
  • Between AWS, Azure and Google Cloud
  • Off VMware, as part of the same plan

How a migration runs.Four stages, one team.

  1. MapWe inventory workloads, data and the dependencies between them, including what talks to what across environments.
  2. PlanWe group workloads into waves, pick cutover windows and document the rollback path for each wave.
  3. MoveWe migrate each wave and test it with your team before switching traffic.
  4. SettleOnce you confirm everything works, we retire the old environment. Until then, rollback stays available.

Leaving a cloud is a migration too.Out is as planned as in.

Moving out of a public cloud gets less attention than moving in, but it needs the same care. Data has to be copied while applications keep running, and cloud-specific pieces need a home on the other side.

We size the destination cluster in the design stage, so you get a rack elevation, node roles and a fixed monthly price before the first wave moves. We rack, cable, burn in and benchmark every node, then migrate your workloads onto it.

Questions, answered.

Can you move us from VMware and into a cloud at the same time?

Yes. A VMware exit can be part of the same migration plan, moving to Proxmox VE or Hyper-V, or keeping you on vSphere with a cleaner footprint.

What happens if the cutover goes wrong?

Every wave has a documented rollback path, and the source environment stays ready until your team confirms the new one works.

Do you only migrate out of public clouds?

No. We migrate in either direction: into a public cloud, out of one, or between providers.

Can large data sets move over a private connection?

Where a private connection to the provider is available, migration traffic can use it instead of the public internet. Options are confirmed per provider and metro.

Talk to the engineers who will build it.

Tell us what you run today and where you’re headed. We’ll come back with a design and a fixed monthly price.

Download the whitepaper

How hyperconvergence works, what goes into a cluster rack, and how to tell whether a private cluster fits your workloads. Tell us where to send it and the download link appears right away.